Unanswered How to recover project server -2007 -pwa site

  • 02/جمادى الثانية/1433 10:11 ص
     
     

    Hi every one ,

    How to recover project server-2007 pwa site....only home tab show in pwa site..


    Neeraj

جميع الردود

  • 02/جمادى الثانية/1433 11:12 ص
    المشرف
     
     

    Hi Neeraj,

    Just to clarify, you have a /PWA site on your PS2007 instance? Does it contain the Project Server left hand / quick launch menu?

    What occurred that has warranted a recovery?


    Alex Burton
    www.epmsource.com | Twitter
    Project Server TechCenter | Project Developer Center | Project Server Help | Project Product Page

  • 03/جمادى الثانية/1433 06:02 ص
     
     

    Hi Alexander ,<o:p></o:p>

    Thanks replay me....<o:p></o:p>

     yes it contain the Project Server left hand / quick launch menu but open project its workspace not available in pwa site...how to recover workspace ...<o:p></o:p>


    Neeraj

  • 03/جمادى الثانية/1433 08:48 ص
    المشرف
     
     

    Hi,

    Can you verify that the project site still physically exists? If so you may just need to relink it via Server Settings > Project Sites.

    If the site does not exist,  then it makes it slightly more complicated and requires your IT to perform a restore of the site from a backed up content db.

    Let us know if the site exists or not, and we can talk you through the other way in a bit more detail


    Alex Burton
    www.epmsource.com | Twitter
    Project Server TechCenter | Project Developer Center | Project Server Help | Project Product Page

  • 04/جمادى الثانية/1433 08:52 ص
     
     

    Hi Alexander ,

    Thanks replay ...

    The site is deleted in central admin .only database backup and farm backup is available.. How to restore old pwa site..

     


    Neeraj