Can I Preserve the Database when doing a cluster upgrade from HPC Server 2008 to HPC Server 2008 R2?
-
20/جمادى الثانية/1432 02:51 م
We're doing an upgrade of our small HPC cluster (HN/CN, 3 CN), from HPC Server 2008 to HPC Server 2008 R2, and I was wondering if we can save the usage data that's in the database already, or if that gets wiped out.
We will be doing a fresh install of HPC Server 2008 R2 on all nodes.
Can I back up the DB and restore it after the upgrade, or is there a compatibility issue?
Thanks!
Tom
boulder_dude
جميع الردود
-
18/رجب/1432 08:47 ص
Hi Tom,
Have you reviewed our documentation for backup & restore procedures at http://technet.microsoft.com/en-us/library/ee247401(WS.10).aspx?
Thanks,
--Brian- تم الاقتراح كإجابة بواسطة Brian Broker 10/رمضان/1432 07:57 ص
- تم وضع علامة كإجابة بواسطة boulder_dude2000 10/رمضان/1432 11:44 ص
-
18/رجب/1432 11:27 ص
Hi Brian - this is exactly what I was looking for.
thanks very much for responding.
Tom
boulder_dude- تم الاقتراح كإجابة بواسطة Brian Broker 10/رمضان/1432 07:57 ص
- تم إلغاء اقتراح كإجابة بواسطة Brian Broker 10/رمضان/1432 07:57 ص