Project Server 2007 SP3 List of Issues that are addressed in this Service Pack?

Unanswered Project Server 2007 SP3 List of Issues that are addressed in this Service Pack?

  • Thursday, 29 December 2011 9:00 PM
     
     

    Hi Everyone,

    Technet techcenter contains an excellent list for issues that are addressed in Service Pack X for Exchange Server 2007 Technet-->Exchange Server 2007-->Operations-->Monitoring and Operations Management-->Operations Management-->Exchange 2007 Servicing-->Issues That are Fixed in Exchange Server 2007 Service Pack X. http://technet.microsoft.com/en-us/library/ff842405(EXCHG.80).aspx

    Does Project Server 2007 have a similar posting at TechNet or another site for issues that are fixed originized by Service Pack?

    Thanks,

    David


    David

All Replies

  • Friday, 30 December 2011 5:32 AM
     
     

    Hi David,

    I havn't seen any specific list of SP3 fixes yet. but it seems its new fixes are related to security, performance etc. as per technet, Previously unreleased fixes that were made specifically for this service pack. In addition to general product fixes, this includes improvements in stability, performance, and security. Also,  All the public updates, security updates, cumulative updates, and hotfixes that were released through September 2011.

    Here are the links:
    Service Pack 3 have now been release for Project 2007 and Project Server 2007 (along with the other Office 2007 products) – http://blogs.technet.com/b/office_sustained_engineering/archive/2011/10/25/office-2007-and-sharepoint-2007-service-pack-3-availability.aspx

    Project 2007 SP3: http://support.microsoft.com/kb/2526091

    Office Server 2007 SP3 (includes Project Server 2007): http://support.microsoft.com/kb/2526299

    Windows SharePoint Services 3.0 SP3: http://support.microsoft.com/kb/2526305

    The 2007 Microsoft Office servers Service Pack 3 (SP3) and the 2007 Microsoft Office servers Language Pack SP3 provide the latest updates to the 2007 Office Servers and to the 2007 Office Servers Language Pack. This package includes 2007 Microsoft Project Server. These updates include two main categories of fixes: 

    SP3 doesn't include the October 2011 CU. You may need to install this with SP3.


    Thanks, Amit Khare |EPM Consultant| Blog: http://amitkhare82.blogspot.com http://www.linkedin.com/in/amitkhare82
  • Tuesday, 3 January 2012 10:19 PM
     
     

    Thanks Amit,  and yes we have those links as well. 

    What we were looking for was a detailed 'fix' list similar to the one posted at Technet for Exchange Server 2007 Service Packs  which I must say kudos to the Exchange folks for taking the time to provide this detailed 'Fix' list to their Exchange clients.

    Does any one know of a site outlining a detailed 'Fix' list for all Project Server 2007 Service Packs?

    Thanks,

    David

     


    David