Hi Everyone,
When editing a project's Project Information using a PDP I get an error. This seems to specific to only two projects so far, both of which have data going back a few years. At first I couldn't change the owner, but if I use the OOTB ProjectInformation PDP, I can change the owner. This doesn't resolve my issue though since there is information in many other fields that needs to be updated.
Using Project Professional I can save and publish the projects
Any help would be greatly appreciated.
Queue Error:
General- Project:
- ProjectSchedulingEngineException (9133). Details: id='9133' name='ProjectSchedulingEngineException' uid='3e0fef40-5636-4ca6-8db8-818a25a4fc79' exception='Microsoft.Office.Project.Scheduling.SchedulingException: Cannot extend beyond minimum date at Microsoft.Office.Project.Server.BusinessLayer.ProjectSchedule.Schedule() at Microsoft.Office.Project.Server.BusinessLayer.ProjectMain.HandleProject(ProjectDataSet dataset, Guid projectUid, Boolean fSkipSchedulingCalc, Guid userUid, String userName, Boolean isNew, Boolean addColumns, ProjectLocks projectLock, Boolean fCheckReadOnly, Boolean fCheckProtectedActuals, Boolean fAllowAddEntRes, Boolean fOptIndexRecalced, Guid templateUid, Boolean fSkipCfFormulaCalc)'.
- Queue:
- GeneralQueueJobFailed (26000) - ProjectUpdate.ProjectUpdateMessage. Details: id='26000' name='GeneralQueueJobFailed' uid='c8de8a23-83ef-4a9b-95bd-92f6cf5083e6' JobUID='83eddb0c-8461-4d36-bfb8-c993f0de271a' ComputerName='SRVNCRSPAS02' GroupType='ProjectUpdate' MessageType='ProjectUpdateMessage' MessageId='2' Stage=''. For more details, check the ULS logs on machine SRVNCRSPAS02 for entries with JobUID 83eddb0c-8461-4d36-bfb8-c993f0de271a.
-
ULS Error:
03/29/2012 10:47:19.80 Microsoft.Office.Project.Server (0x1498) 0x170C Project Server Queue cf0l Critical Standard Information:PSI Entry Point: Project User: DOMAIN\spider Correlation Id: 5223d501-26fa-4197-9f6f-ab61b5724965 PWA Site URL: http://ps/PWA SSP Name: Project Web App Service App 1 PSError: GeneralQueueJobFailed (26000) A queue job has failed. This is a general error logged by the Project Server Queue everytime a job fails - for effective troubleshooting use this error message with other more specific error messages (if any), the Operations guide (which documents more details about queued jobs) and the trace log (which could provide more detailed context). More information about the failed job follows. GUID of the failed job: 83eddb0c-8461-4d36-bfb8-c993f0de271a. Name of the computer that processed this job: SRVNCRSPAS02 (to debug further, you need to look at the trace log from ... 20dbd57f-5340-4962-a7ea-373c3d9b42dd
03/29/2012 10:47:19.80* Microsoft.Office.Project.Server (0x1498) 0x170C Project Server Queue cf0l Critical ...this computer). Failed job type: ProjectUpdate. Failed sub-job type: ProjectUpdateMessage. Failed sub-job ID: 2. Stage where sub-job failed: (this is useful when one sub-job has more than one logical processing stages). 20dbd57f-5340-4962-a7ea-373c3d9b42dd
03/29/2012 10:47:19.80 Microsoft.Office.Project.Server (0x1498) 0x170C Project Server Queue cf0m Medium PWA:http://ps/PWA, ServiceApp:Project Web App Service App 1, User:DOMSIN\app_spadmin, PSI: [QUEUE] ProjectQ: Group b479edd8-ccd9-4d00-8433-a6cd534ffa21 type = ProjectUpdate aborted at Message 2 20dbd57f-5340-4962-a7ea-373c3d9b42dd
- Project:
All Replies
-
Thursday, 29 March, 2012 7:07 PM
Hi there,
What patch level is your Project Server 2010 environment? Do you have at least SP1 and June 2011 CU installed on the farm?
Thanks
Paul
Paul Mather | Twitter | http://pwmather.wordpress.com
-
Thursday, 29 March, 2012 7:11 PM
Thank you for your response Paul, unfortunately we don't have SP1 installed yet, we have a project underway to accomplish this, but it's going to be at least a month before it gets approved and promoted to our production environment.
-
Thursday, 29 March, 2012 7:18 PM
I know it is not ideal but I think the only option is to wait until you have SP1 + at least June 2011 CU installed, I seem to remember something similar for an install that was resolved when they installed SP1 + June 2011 CU.
Thanks
Paul
Paul Mather | Twitter | http://pwmather.wordpress.com
-
Friday, 30 March, 2012 2:55 PMI've had this issue a few times post SP1 and June CU. Ideally raise the issue to Microsoft Premier Support if you can. As a potential workaround though i think I had to save the project as an .mpp file and then re-import it into Project Server, gave it the same name and it started to work again. You will of course need to change the PM and status manager to the correct person once you do this though.
Regards,
Piet Remen
http://pietremen.blogspot.com.au