Standard1 Calendar in Project Server 2007
-
Friday, March 30, 2012 12:49 PM
Hi,
I have a project which is saved locally in my system.
In that plan i have a calendar called "Standard1", which is created locally.
I had uploaded the plan to server using "Import project to enterprise" option, i mapped all the local resources with the enterprise resources and while saving the "Standard1" calendar only available, so i selected the same.
After importing i checked in the resource sheet all the resources are having "Standard1" calendar instead of "Standard" calendar.
In the plan which i was saved locally the resources are having "Standard" calendar.
I tried to changed the calendar of the resources in Project Server, but "Standard" calendar doesn't visible in Resource sheet. Only "Standard1" calendar is available.
I had checked in the Enterprise Global(Tools-Organizer-Calendar tab),i can see only Standard1 calendar in Enterprise Global. If i try to delete the "Standard1" calendar, it shows "Standard calendar cannot be deleted or renamed".
I checked in the Enterprise Calendars only one calendar "Standard" is available.
Can anyone tell me how to get rid of this "Standard1" calendar?
K.Gokulraj
All Replies
-
Friday, March 30, 2012 1:01 PM
-
Friday, March 30, 2012 1:42 PM
Thanks for your reply, i have tried but no luck.
K.Gokulraj
-
Friday, March 30, 2012 1:50 PM
Open the Project in Project Professional when it is connected to Project Server
Try to Save As the Project and on the Save As window Change the Calendar to the Standard Calendar on Server.
Once you are able to do that make sure the new project has the right calendar and you can delete the old project.
Abhijeet M. Mohite
-
Friday, March 30, 2012 2:01 PM
The problem is, while saving i don't see the "Standard" calendar, i can see only "Standard1" calendar in the drop down list.
But in server only one calendar is there, which is "Standard" calendar
K.Gokulraj
-
Friday, March 30, 2012 2:21 PM
Unfortunately I do not have PP 2007 working with me.
Did you try opening the Project Professional in Connected Mode to Server and clicking Project Information.
In the Project Information check if you can find your standard calendar.
Do above while you open a new project plan, do not use you current project plan which is having problem.
This will clear doubt if its happening only with this project or all other projects.
Abhijeet M. Mohite
Also check if your Enterprise Calendar is checked-in and not checked out for editing.- Edited by Abhijeet Mohite Friday, March 30, 2012 2:22 PM
-
Friday, March 30, 2012 4:04 PM
Both "Standard" and "Standard1" calendars are available in Project information.
But i cannot edit the resources calendar in resource center, i.e. if i select a resource in resource center and open it in ms project, in the resource sheet base calendar field i can see only "Standard1" calendar not "Standard" calendar.
K.Gokulraj
-
Friday, March 30, 2012 4:33 PMThe next thing I would try would be to close Project Pro, then find and delete all copies of global.mpt on your desktop computer. Then restart Project Pro.
Reid McTaggart – DeltaBahn Vice President
Blog | Twitter | LinkedIn- Edited by Reid McTaggart Friday, March 30, 2012 4:33 PM
-
Monday, April 02, 2012 10:42 AM
Hi Reid,
Can you tell me how to delete global.mpt files?
K.Gokulraj
-
Monday, April 02, 2012 12:47 PM
You delete global.mpt just as you would any other file.
Close Microsoft Project.
Use Windows Explorer to find all copies of global.mpt (there may be more than one). Select each one and click Delete.
When you restart Project, a new (clean) global.mpt will be created automatically.
Reid McTaggart – DeltaBahn Vice President
Blog | Twitter | LinkedIn -
Monday, April 02, 2012 3:37 PM
i have deleted and restarted my sytem but still it doesn't work.
Even in my colleague's system also same problem.
K.Gokulraj