Answered Project Web Access.

  • Monday, December 28, 2009 11:51 AM
     
     
    Hi Techies,
     
    iam trying add Data in Look up table,iam getting this error.

    The Look up table could not  be Saved due to the Follwoing Error.

    an unexpected error has Occured.

    The log file is below.


    12/16/2009 00:53:12.67  Microsoft.Office.Project.Server (0x0B60) 0x2518 Windows SharePoint Services    Database                       7t61 Verbose  DatabaseConnectionString acquired.  Server=SQLHELLO\Data2;Database=PWADatabse_NEW;Trusted_Connection=yes;App=Windows SharePoint Services;Timeout=15 
    12/16/2009 00:53:12.67  Microsoft.Office.Project.Server (0x0B60) 0x2518                                484                            880l Verbose  ConnectionString: 'Server=SQLHELLO\Data2;Database=PWADatabse_NEW;Trusted_Connection=yes;App=Windows SharePoint Services;Timeout=15'    ConnectionState: Closed ConnectionTimeout: 15 
    12/16/2009 00:53:12.67  Microsoft.Office.Project.Server (0x0B60) 0x2518                                1624                           8acb Verbose  Reverting to process identity 
    12/16/2009 00:53:12.67  Microsoft.Office.Project.Server (0x0B60) 0x2518                                1624                           8acc Verbose  Current user before SqlConnection.Open: Name: CSTDD\SampleSID: S-1-5-21-502757206-1005391493-1542849698-127256 ImpersonationLevel: None 
    12/16/2009 00:53:12.67  Microsoft.Office.Project.Server (0x0B60) 0x2518                                1624                           8acf Verbose  Current user after SqlConnection.Open: Name: CSTDD\SampleSID: S-1-5-21-502757206-1005391493-1542849698-127256 ImpersonationLevel: None 

    Thanks,
    Raju.

All Replies

  • Tuesday, December 29, 2009 5:36 AM
    Moderator
     
     
    Hi Raju,

     Are those the only entries in the logs pertaining to this error?

    Thanks,
    Boaz Lev
  • Tuesday, December 29, 2009 12:36 PM
     
     

    Hi Boaz,
         the same error is repeating the Log file when iam trying to add the data in the Lookuptable.

    Thnaks in advance,
    Raju.

  • Monday, January 04, 2010 11:41 PM
    Moderator
     
     Answered
    Raju - please add more information about the problem. What kind of lookup table, what is the data you added, does it happen every time etc.  that could help us think about what may be wrong.  Thanks !
    I am Project 2010 ready - are you ?