Project Customization and Programming
Discuss customizations and programming for Project Web App, Project Server, Project Professional and Project Standard. Includes User Interface (UI) customizations, Project Server Interface (PSI) and Visual Basic for Applications (VBA) Programming.
Annonces
- Link
Welcome to the forum!
Jan KalisMicrosoft Employeevendredi 8 janvier 2010 00:23For more information on:
- Programming and development please see the Project 2010 MSDN Developer Center http://msdn.microsoft.com/en-us/office/aa905469.aspx
- Also be sure to target your RSS reader to the official Project Programmability Blog http://blogs.msdn.com/project_programmability/
- Link
Project 2013 SDK - March 2013 update
Jim Corbin vendredi 27 juillet 2012 18:13The Project 2013 SDK download is updated. The conceptual, how-to, and reference documentation in the download closely matches the Project 2013 developer documentation online content published on MSDN.
The Project2013SDK.msi download file now installs properly on Windows 8 and Windows Server 2012.
The Project 2013 SDK download contains:
- The on-premises Reporting database schema reference, ProjectServer2013_ReportingDB.chm, and the OLAP cube schema reference.
- Updated VBA Help for local use. Objects such as Chart, Report, Series, and Shape now show correct members tables, properties, and methods topics.
- Basic reference topics for the JavaScript client-side object model (JSOM), which includes REST endpoints and HTTP request syntax. You can use the JSOM for development of Project Online solutions for cross-browser web apps and for non-Windows platforms.
- Sixteen complete code solutions, including two task pane apps (with minor updates) for Project, the QuickStatus app sample for Project Server and Project Online, eight client-side object model (CSOM) solutions, two solutions for querying the ProjectData service for reporting, and three updated legacy PSI solutions.
- DLLs and a license for redistribution of the Project Server CSOM assemblies, JavaScript files for the CSOM, the Microsoft.Office.Project.Server.Library assembly, and the Microsoft.Office.Project.Server.Events.Receivers library for on-premises development.
Notes: 1. The REDIST.zip file that is attached to the Project_Programmability blog post contains the RTM build
15.0.4420.1017 of the Project Server assemblies for redistribution, including the
Microsoft.Office.Project.Schema.dll assembly, for developing event handlers.
2. Project CSOM solutions also require the redistributable DLLs for the SharePoint 2013 CSOM,
which are at SharePoint Server 2013 Client Components SDK. - Updated Intellisense files for the PSI and CSOM, source code for creating a PSI proxy assembly, and instructions on how to update the PSI proxy files.
- XML schemas for the Project client, AppProvisioning, and the Statusing PSI.
The top-level online landing page for the Project SDK is Project for developers (http://msdn.microsoft.com/project).
For additional Project-related SDK content, see Office for developers (http://msdn.microsoft.com/office), SharePoint for developers (http://msdn.microsoft.com/sharepoint), and Build apps for Office and SharePoint (http://msdn.microsoft.com/office/apps/). The two articles on Task pane apps for Project are in the Apps for Office and SharePoint SDK, and the JavaScript API for Office reference includes information specific for Project, the ProjectDocument object with eleven methods and three events, and four enumerations for Project.
Want to try out Project 2013?
- Sign up for Project Online and Project Pro for Office 365
- Download Project Professional 2013 and Project Server 2013
--Jim
- Link
Please specify the version you are using when you ask your question
It makes a big difference in answering your questions
Filtre et triUtilisez ces options pour affiner la liste des discussions.
- 931320

Customizing the Project 2010 ribbon with a VSTO add-in
Jim Corbin vendredi 23 avril 2010 18:21 - 028702

What questions don't go to the Project Customization and Programming Forum?
Jan KalisMicrosoft Employeevendredi 8 janvier 2010 00:50 - 06

workflow issue -Project server 2013
Balamurugan-S il y a 7 minute(s) - 165

error
123bava il y a 19 heure(s) et 41 minute(s) - 165

Youtube with C#
Hmilkovi il y a 19 heure(s) et 26 minute(s) - 286

How to find a plan as Sub plan - PSI
ram kanumuri vendredi 17 mai 2013 15:36 - 2120

Hiding a button disables ribbon
MeerDev jeudi 16 mai 2013 04:08 - 1110

RemoveDependencyRow method is not working properly
bhardia jeudi 16 mai 2013 05:37 - 181

Windows Phone 8
TV.Rahul vendredi 17 mai 2013 10:04 - 079

[JSGrid] Error in jsgrid.debug.js
Quentin V vendredi 17 mai 2013 07:59 - 1107

Project Server 2010 - WssServers.FindByWSTS_SERVER_UID returns no rows using Site UID returned by ReadWSSSettings
Erik RHS jeudi 16 mai 2013 01:27 - 5918

Looking JS Grid Documentation - WebCast no available anymore
Javier Perez - MCPD, MCITP, MCAD, MCTS samedi 12 janvier 2013 16:23 - 1120

How to get all the assigned resources on a specific task programmatically?
M O N Z mercredi 15 mai 2013 07:43 - 1116

Set Resource Base Calendar and Resource Department fields programmatically
Meghask mardi 14 mai 2013 13:55 - 095

Populate field with Project name or Site name in list
ErikJungan jeudi 16 mai 2013 09:16 - 3134

Project 2010 Standard - VBA export to Excel; Latest Baseline
Shawn.Gilbert mardi 14 mai 2013 14:12 - 3132

Project detail page is not getting updated in PWA site
MsSPJ mardi 14 mai 2013 18:38 - 0112

Saving custom web part on previous/next
Parkelj mercredi 15 mai 2013 14:25 - 12201

Assign Owner of a Project in Project 2007
Kathy Tullis vendredi 10 mai 2013 17:28 - 2155

MS Project Server 2010 - VBA For Custom Table As User
del_ops samedi 11 mai 2013 22:30 - 1157

changing the owner of a project in project server 2010 using PSI
Dilawar Mansoori dimanche 12 mai 2013 11:51 - 0108

Extract Actions from Sharepoint lists using VBA - Project Server 2010
Sean Pears mardi 14 mai 2013 04:49