Project Customization and Programming
Discuss customizations and programming for Project Web App, Project Server, Project Professional and Project Standard. Includes User Interface (UI) customizations, Project Server Interface (PSI) and Visual Basic for Applications (VBA) Programming.
Annonces
- Lien
Welcome to the forum!
Jan KalisMicrosoft Employeevendredi 8 janvier 2010 00:23For more information on:
- Programming and development please see the Project 2010 MSDN Developer Center http://msdn.microsoft.com/en-us/office/aa905469.aspx
- Also be sure to target your RSS reader to the official Project Programmability Blog http://blogs.msdn.com/project_programmability/
- Lien
Project 2013 SDK - March 2013 update
Jim Corbin vendredi 27 juillet 2012 18:13The Project 2013 SDK download is updated. The conceptual, how-to, and reference documentation in the download closely matches the Project 2013 developer documentation online content published on MSDN.
The Project2013SDK.msi download file now installs properly on Windows 8 and Windows Server 2012.
The Project 2013 SDK download contains:
- The on-premises Reporting database schema reference, ProjectServer2013_ReportingDB.chm, and the OLAP cube schema reference.
- Updated VBA Help for local use. Objects such as Chart, Report, Series, and Shape now show correct members tables, properties, and methods topics.
- Basic reference topics for the JavaScript client-side object model (JSOM), which includes REST endpoints and HTTP request syntax. You can use the JSOM for development of Project Online solutions for cross-browser web apps and for non-Windows platforms.
- Sixteen complete code solutions, including two task pane apps (with minor updates) for Project, the QuickStatus app sample for Project Server and Project Online, eight client-side object model (CSOM) solutions, two solutions for querying the ProjectData service for reporting, and three updated legacy PSI solutions.
- DLLs and a license for redistribution of the Project Server CSOM assemblies, JavaScript files for the CSOM, the Microsoft.Office.Project.Server.Library assembly, and the Microsoft.Office.Project.Server.Events.Receivers library for on-premises development.
Notes: 1. The REDIST.zip file that is attached to the Project_Programmability blog post contains the RTM build
15.0.4420.1017 of the Project Server assemblies for redistribution, including the
Microsoft.Office.Project.Schema.dll assembly, for developing event handlers.
2. Project CSOM solutions also require the redistributable DLLs for the SharePoint 2013 CSOM,
which are at SharePoint Server 2013 Client Components SDK. - Updated Intellisense files for the PSI and CSOM, source code for creating a PSI proxy assembly, and instructions on how to update the PSI proxy files.
- XML schemas for the Project client, AppProvisioning, and the Statusing PSI.
The top-level online landing page for the Project SDK is Project for developers (http://msdn.microsoft.com/project).
For additional Project-related SDK content, see Office for developers (http://msdn.microsoft.com/office), SharePoint for developers (http://msdn.microsoft.com/sharepoint), and Build apps for Office and SharePoint (http://msdn.microsoft.com/office/apps/). The two articles on Task pane apps for Project are in the Apps for Office and SharePoint SDK, and the JavaScript API for Office reference includes information specific for Project, the ProjectDocument object with eleven methods and three events, and four enumerations for Project.
Want to try out Project 2013?
- Sign up for Project Online and Project Pro for Office 365
- Download Project Professional 2013 and Project Server 2013
--Jim
- Lien
Please specify the version you are using when you ask your question
It makes a big difference in answering your questions
Filtre et triUtilisez ces options pour affiner la liste des discussions.
- 931416

Customizing the Project 2010 ribbon with a VSTO add-in
Jim Corbin vendredi 23 avril 2010 18:21 - 028793

What questions don't go to the Project Customization and Programming Forum?
Jan KalisMicrosoft Employeevendredi 8 janvier 2010 00:50 - 312895

User form for Resource Assignment
Jake683 mercredi 18 juillet 2012 17:48 - 2811387

How to Read list of projects using PSI that are my own, where I am the owner
AK_123 vendredi 10 décembre 2010 18:08 - 272764

Load a filtered resource pool from excel with a project macro?
Jake683 mardi 21 août 2012 15:02 - 238447

Custom fields in olap cubes
Bert Wolff lundi 9 août 2010 14:40 - 227630

Project Server 2010 Project.SVC Webservice
Software Crafter mardi 28 décembre 2010 12:54 - 2111160

Problem with QueueUpdateProject (PSI)
I D lundi 7 mars 2011 21:52 - 2110543

custom Project ID
ghostme lundi 13 décembre 2010 16:28 - 207363

project server 2010: setting a project manager on a project and setting his permissions
geo_d lundi 28 mars 2011 10:48 - 192185

Run an excel macro out of project user-form
Jake683 lundi 10 septembre 2012 17:01 - 189599

Graphic indicators for the project
B.D jeudi 15 juillet 2010 18:43 - 189604

Workflow problem - STAGE_INFO is DBNull
avion007 mercredi 23 mars 2011 12:45 - 184622

Tasks Data directly from Database
trstringer mardi 13 septembre 2011 15:08 - 175339

How to Prepopulate a Unique Id in a EPT Custom field ??
anuj astro vendredi 30 décembre 2011 05:43 - 178169

Macros added to Project 2010 Ribbon do not run
DeanLC jeudi 11 novembre 2010 15:41 - 178343

How to track the creation of project of particular EPT type in PS2010 Server Side Event Handlers?
Andrew Grushewsky ICC lundi 22 novembre 2010 09:00 - 171402

How to make a subset array of tasks in MS Project VBA without filters
Ocean_Engineer jeudi 7 février 2013 23:04 - 164429

fast forward Project time
gborge vendredi 18 novembre 2011 02:58 - 162795

Maintaining external list data in PDP's
PravinMohite lundi 21 novembre 2011 05:12 - 161606

PSI CALLS DO NOT WORK IN PROJECT SERVER 2013
Quentin V mardi 19 février 2013 14:31 - 161748

Project Server 2013 PSI calls from Sharepoint 2013
David Rousselle mercredi 13 février 2013 13:45