Project Customization and Programming
Discuss customizations and programming for Project Web App, Project Server, Project Professional and Project Standard. Includes User Interface (UI) customizations, Project Server Interface (PSI) and Visual Basic for Applications (VBA) Programming.
Annunci
- Collegamento
Welcome to the forum!
Jan KalisMicrosoft Employeevenerdì 8 gennaio 2010 00:23For more information on:
- Programming and development please see the Project 2010 MSDN Developer Center http://msdn.microsoft.com/en-us/office/aa905469.aspx
- Also be sure to target your RSS reader to the official Project Programmability Blog http://blogs.msdn.com/project_programmability/
- Collegamento
Project 2013 SDK - March 2013 update
Jim Corbin venerdì 27 luglio 2012 18:13The Project 2013 SDK download is updated. The conceptual, how-to, and reference documentation in the download closely matches the Project 2013 developer documentation online content published on MSDN.
The Project2013SDK.msi download file now installs properly on Windows 8 and Windows Server 2012.
The Project 2013 SDK download contains:
- The on-premises Reporting database schema reference, ProjectServer2013_ReportingDB.chm, and the OLAP cube schema reference.
- Updated VBA Help for local use. Objects such as Chart, Report, Series, and Shape now show correct members tables, properties, and methods topics.
- Basic reference topics for the JavaScript client-side object model (JSOM), which includes REST endpoints and HTTP request syntax. You can use the JSOM for development of Project Online solutions for cross-browser web apps and for non-Windows platforms.
- Sixteen complete code solutions, including two task pane apps (with minor updates) for Project, the QuickStatus app sample for Project Server and Project Online, eight client-side object model (CSOM) solutions, two solutions for querying the ProjectData service for reporting, and three updated legacy PSI solutions.
- DLLs and a license for redistribution of the Project Server CSOM assemblies, JavaScript files for the CSOM, the Microsoft.Office.Project.Server.Library assembly, and the Microsoft.Office.Project.Server.Events.Receivers library for on-premises development.
Notes: 1. The REDIST.zip file that is attached to the Project_Programmability blog post contains the RTM build
15.0.4420.1017 of the Project Server assemblies for redistribution, including the
Microsoft.Office.Project.Schema.dll assembly, for developing event handlers.
2. Project CSOM solutions also require the redistributable DLLs for the SharePoint 2013 CSOM,
which are at SharePoint Server 2013 Client Components SDK. - Updated Intellisense files for the PSI and CSOM, source code for creating a PSI proxy assembly, and instructions on how to update the PSI proxy files.
- XML schemas for the Project client, AppProvisioning, and the Statusing PSI.
The top-level online landing page for the Project SDK is Project for developers (http://msdn.microsoft.com/project).
For additional Project-related SDK content, see Office for developers (http://msdn.microsoft.com/office), SharePoint for developers (http://msdn.microsoft.com/sharepoint), and Build apps for Office and SharePoint (http://msdn.microsoft.com/office/apps/). The two articles on Task pane apps for Project are in the Apps for Office and SharePoint SDK, and the JavaScript API for Office reference includes information specific for Project, the ProjectDocument object with eleven methods and three events, and four enumerations for Project.
Want to try out Project 2013?
- Sign up for Project Online and Project Pro for Office 365
- Download Project Professional 2013 and Project Server 2013
--Jim
- Collegamento
Please specify the version you are using when you ask your question
It makes a big difference in answering your questions
Filtro e ordinamentoUsa queste opzioni per ridurre l'elenco delle discussioni.
- 931442

Customizing the Project 2010 ribbon with a VSTO add-in
Jim Corbin venerdì 23 aprile 2010 18:21 - 028813

What questions don't go to the Project Customization and Programming Forum?
Jan KalisMicrosoft Employeevenerdì 8 gennaio 2010 00:50 - 799

Project Server 2013....How do you move your Production Data to development server.
Toomanyhats mercoledì 22 maggio 2013 20:09 - 10111

Change from resource view to gantt view
Greymane mercoledì 22 maggio 2013 11:44 - 165

Sharepoint Alert mails are not triggreing for custom workflows
Surekha1234 venerdì 24 maggio 2013 10:01 - 062

ONE Operating System
matty EST BC venerdì 24 maggio 2013 13:35 - 1113

Changing a cell's text value JS Grid
MeerDev martedì 21 maggio 2013 19:35 - 168

Error at QueueUpdateProject in CheckIn Event Handler
Airwave1981 giovedì 23 maggio 2013 06:39 - 57466

How can I add Forward button in Approved/reject window in Project Server 2010
Nitin Goyal85 sabato 4 giugno 2011 19:01 - 080

Unknown Error when trying to create a lookup table using CSOM and C# (Project Server 2013 Cloud - Office 365)
PF Developer giovedì 23 maggio 2013 11:08 - 5165

workflow issue -Project server 2013
Balamurugan-S domenica 19 maggio 2013 07:14 - 178

Access 2010 Form Issue
MG1001 mercoledì 22 maggio 2013 15:30 - 397

Project to excel - vba - 1004 Application-defined or object-defined error
yayo84 martedì 21 maggio 2013 23:24 - 177

Split plan batch order while master scheduling in AX 2012
Arsya Putra mercoledì 22 maggio 2013 08:18 - 4156

How to find a plan as Sub plan - PSI
ram kanumuri venerdì 17 maggio 2013 15:36 - 8984

Looking JS Grid Documentation - WebCast no available anymore
Javier Perez - MCPD, MCITP, MCAD, MCTS sabato 12 gennaio 2013 16:23 - 073

PSI 2013: Empty Tasks when create them with QueueUpdateProject2
Sansha Kuvakei mercoledì 22 maggio 2013 09:03 - 3119

custom field in database
Diadi martedì 21 maggio 2013 09:37 - 191

Using Flags in MS Project 2010
Wayside Ranger martedì 21 maggio 2013 22:39 - 088

ProjectHasWriteLock issue in Project Server 2010
Geza Prouza martedì 21 maggio 2013 16:03 - 098

Customize project template pass custom parameter in Visual Studio 2012
praspam martedì 21 maggio 2013 06:57 - 2134

We would like to copy the functionality of the Resource field to a custom field that we add
Sunitha vv lunedì 20 maggio 2013 08:04