Changed Site URL creates issues, project workspaces
-
2012년 4월 25일 수요일 오후 3:03
Hello
For various reasons we need to change the site URL from server1 to server2. I am happy doing this in Sharepoint via Alternate Access Mappings. However a few other items do break. For instance on the opening page of PWA we recieve the error of SQL Server reporting services "
-
The
item 'http://<server1>/PWA/SSRS Reports/Project Workspaces Home.rdl' cannot be
found. (rsItemNotFound)
And none of the project workspaces work as they are all still following the server1 name. Could anyone tell me how to fix this please?
-
The
모든 응답
-
2012년 4월 25일 수요일 오후 3:47You have most likely changed the URL in the default zone which in turn has caused this. I would backup then delete the RDL files from the library, and reupload them.
Rob Hardy
-
2012년 4월 25일 수요일 오후 3:51
Hello Rob,
I did change the URL in the default zone. Is this not the best way to do this task? I have changed it back for now to get it working.
Thank you.
-
2012년 4월 25일 수요일 오후 6:44
I am not sure why updating AAM setting did not update workspace URLS
For testing purpose I did tried same step, updated default URL for my PWA from http://psvr2007:8080/PWA2 to http://PSVR2008:8080/PWA2
Added local host to point psvr2008 to same IP address as PSVR2007.
I am able to access PWA site with new URL and all workspace URLS are updated with new URL
In your scenario, where do you get above error?
Are you able to access server settings page
try using http://server2/PWA/_layouts/pwa/admin/admin.aspx
Hrishi Deshpande – DeltaBahn Senior Consultant
Blog | < | LinkedIn -
2012년 4월 26일 목요일 오후 7:38
What you done is ok but try backing up the RDL, deleting it, then reuploading it.
Rob Hardy
- 답변으로 표시됨 Silverpigeon97 2012년 5월 2일 수요일 오전 8:58
-
2012년 4월 27일 금요일 오후 1:15
Hello Rob,
Thank you for your assistance, sorry to be a pain but how do I do that? I'm a bit lost.
-
2012년 4월 27일 금요일 오후 1:16I can access local server settings page.
-
2012년 4월 27일 금요일 오후 2:48