When running PS workflows on upgraded environment

Answered When running PS workflows on upgraded environment

  • 3 ianuarie 2012 14:18
     
     
    Our testing environment of PS2010 and SP2010 was upgraded with SP1 and October CU update. After that the existing workflow start breaking with following error:
    Load Workflow Assembly: System.IO.FileNotFoundException: Could not load file or assembly 'BihConsumerInterop, Version=14.0.0.0, Culture=neutral, PublicKeyToken=48e046c834625a88' or one of its dependencies. The system cannot find the file specified.  File name: 'BihConsumerInterop, Version=14.0.0.0, Culture=neutral, PublicKeyToken=48e046c834625a88'    
     at System.Reflection.Assembly._nLoad(AssemblyName fileName, String codeBase, Evidence assemblySecurity, Assembly locationHint, StackCrawlMark& stackMark, Boolean throwOnFileNotFound, Boolean forIntrospection)
     at System.Reflection.Assembly.InternalLoad(AssemblyName assemblyRef, Evidence assemblySecurity, StackCrawlMark& stackMark, Boolean forIntrospection)    
     at System.Reflection.Assembly.InternalLoad(String assemblyString, Evidence assemblySecurity, StackCrawlMark& stackMark, Boolean forIntrospection)    
     at System.Reflection.Assembly.Load(String assemblyString)    
     at Microsoft.SharePoint.Workflow.SPWinOeHostServices.LoadWorkflowAssembly(SPWorkflowManager manager, String name)
    What should we do?




    • Editat de avion007 3 ianuarie 2012 14:20
    •  

Toate mesajele