Project 2010 Will Not Install
-
13 Nisan 2012 Cuma 19:40
Hello,
I have Microsoft Project 2010 Standard. I recently had to reinstall Windows 7 due to some performance issues. I am now trying to reinstall Project 2010 and it will not install. When I double click on the setup file a dialog opens which looks like it will start installing and immediately closes. I cannot get any further.
I have tried running as administrator and that does not help.
Any ideas?
Thanks,
Ivan Weiss
Tüm Yanıtlar
-
13 Nisan 2012 Cuma 21:51Moderatör
Hello Ivan,
Are you running the 64bit or 32bit version of Windows 7? If you are running the 64bit version, what version of Project (32 or 64 bit) are you trying to install? If you are running any 32-bit versions of Office, you need to install the 32 bit version of Project, even though you are running the 64bit version of Windows.
I hope this helps.
Julie
-
13 Nisan 2012 Cuma 21:54I am running 32 bit of both. I had it installed no issue before I had to reinstall Windows so I know it is not a compatibility problem.
-
13 Nisan 2012 Cuma 22:02Moderatör
If you actually log in with administrator rights and disable any anti-virus any joy? I'm guessing you've rebooted after Win 7 re-installation? Have you attempted to install on a clean boot?
For detailed steps on how to boot the system into clean boot mode, you can refer to this KB article. The steps in XP are similar:
How to troubleshoot a problem by performing a clean boot in Windows Vista or in Windows 7
- Düzenleyen Julie SheetsMVP, Moderator 13 Nisan 2012 Cuma 22:04
- Yanıt Olarak Öneren Sapna Shukla - Project MVPMVP, Moderator 14 Nisan 2012 Cumartesi 16:42
-
15 Nisan 2012 Pazar 11:22I checked my user and it was a debug administrator. I changed that to an administrator account type but no change. The installers just opens and immediately closes.
-
16 Nisan 2012 Pazartesi 13:29ModeratörAny luck installing with a clean boot on Windows 7?
-
16 Nisan 2012 Pazartesi 14:05
Any luck installing with a clean boot on Windows 7?
Nope, tried safe mode as well. Same issue. Very frustrating. And I would like to just call Microsoft but it furiates me I would need to pay for support when their software isn't working.- Yanıt Olarak İşaretleyen Mike GlenModerator 30 Haziran 2012 Cumartesi 21:46
-
21 Mayıs 2012 Pazartesi 10:39Moderatör
Please re-post if this is still an issue, or mark it as answered.
Mike Glen
MVP Project (97 - 11)
Moderator