IT 专业人士的资源 > 论坛主页 > Windows HPC Server Developers - General > Get-HpcJob returns null StartTime for Cancelled jobs
提出问题提出问题
 

已答复Get-HpcJob returns null StartTime for Cancelled jobs

  • 2009年6月22日 17:47willvv 用户奖牌用户奖牌用户奖牌用户奖牌用户奖牌
     
    Hi

    I'm trying to retrieve the job information from a cluster and I'm seeing this behavior.

    If I get the information of the jobs using Get-HpcJobHistory, it returns a Collection with HpcJobHistory objects (one for each job in the given dates), the submit date for these objects is set, if the Job was cancelled it also returns a StartTime (so far I've seen that this date is the same as the EndTime).

    If I get the information for the same job using the Get-HpcJob, I get a HpcJob object, but if the job was cancelled, the value for StartTime is null.

    My questions are:

    Is this the expected behavior?
    Can I be sure that the value is always the same as the EndTime?

    Thanks a lot

答案

  • 2009年6月23日 2:24Zhen WEI MSFT 用户奖牌用户奖牌用户奖牌用户奖牌用户奖牌
     已答复
    Hi, Willvv, sorry for the confusion to have 2 different StartTime, but I think it's not safe to have that assumption. Can you just ignore StartTime when a job is canceled?
    • 已标记为答案willvv 2009年6月23日 3:20
    •  

全部回复