Project Customization and Programming
Discuss customizations and programming for Project Web App, Project Server, Project Professional and Project Standard. Includes User Interface (UI) customizations, Project Server Interface (PSI) and Visual Basic for Applications (VBA) Programming.
公告
- Link
Welcome to the forum!
Jan KalisMicrosoft Employee2010年1月8日 0:23For more information on:
- Programming and development please see the Project 2010 MSDN Developer Center http://msdn.microsoft.com/en-us/office/aa905469.aspx
- Also be sure to target your RSS reader to the official Project Programmability Blog http://blogs.msdn.com/project_programmability/
- Link
Project 2013 SDK - March 2013 update
Jim Corbin 2012年7月27日 18:13The Project 2013 SDK download is updated. The conceptual, how-to, and reference documentation in the download closely matches the Project 2013 developer documentation online content published on MSDN.
The Project2013SDK.msi download file now installs properly on Windows 8 and Windows Server 2012.
The Project 2013 SDK download contains:
- The on-premises Reporting database schema reference, ProjectServer2013_ReportingDB.chm, and the OLAP cube schema reference.
- Updated VBA Help for local use. Objects such as Chart, Report, Series, and Shape now show correct members tables, properties, and methods topics.
- Basic reference topics for the JavaScript client-side object model (JSOM), which includes REST endpoints and HTTP request syntax. You can use the JSOM for development of Project Online solutions for cross-browser web apps and for non-Windows platforms.
- Sixteen complete code solutions, including two task pane apps (with minor updates) for Project, the QuickStatus app sample for Project Server and Project Online, eight client-side object model (CSOM) solutions, two solutions for querying the ProjectData service for reporting, and three updated legacy PSI solutions.
- DLLs and a license for redistribution of the Project Server CSOM assemblies, JavaScript files for the CSOM, the Microsoft.Office.Project.Server.Library assembly, and the Microsoft.Office.Project.Server.Events.Receivers library for on-premises development.
Notes: 1. The REDIST.zip file that is attached to the Project_Programmability blog post contains the RTM build
15.0.4420.1017 of the Project Server assemblies for redistribution, including the
Microsoft.Office.Project.Schema.dll assembly, for developing event handlers.
2. Project CSOM solutions also require the redistributable DLLs for the SharePoint 2013 CSOM,
which are at SharePoint Server 2013 Client Components SDK. - Updated Intellisense files for the PSI and CSOM, source code for creating a PSI proxy assembly, and instructions on how to update the PSI proxy files.
- XML schemas for the Project client, AppProvisioning, and the Statusing PSI.
The top-level online landing page for the Project SDK is Project for developers (http://msdn.microsoft.com/project).
For additional Project-related SDK content, see Office for developers (http://msdn.microsoft.com/office), SharePoint for developers (http://msdn.microsoft.com/sharepoint), and Build apps for Office and SharePoint (http://msdn.microsoft.com/office/apps/). The two articles on Task pane apps for Project are in the Apps for Office and SharePoint SDK, and the JavaScript API for Office reference includes information specific for Project, the ProjectDocument object with eleven methods and three events, and four enumerations for Project.
Want to try out Project 2013?
- Sign up for Project Online and Project Pro for Office 365
- Download Project Professional 2013 and Project Server 2013
--Jim
- Link
Please specify the version you are using when you ask your question
It makes a big difference in answering your questions
篩選及排序使用這些選項可縮小討論清單。
- 931345

Customizing the Project 2010 ribbon with a VSTO add-in
Jim Corbin 2010年4月23日 18:21 - 028740

What questions don't go to the Project Customization and Programming Forum?
Jan KalisMicrosoft Employee2010年1月8日 0:50 - 031

property problems
DG924 2 小時 5 分鐘前 - 162

TFS
saini.sanjay231 14 小時 12 分鐘前 - 165

We would like to copy the functionality of the Resource field to a custom field that we add
Sunitha vv 11 小時 47 分鐘前 - 183

Automation of Microsoft Project?
chcw 2013年5月17日 18:18 - 4198

Formula in project server calculated field for cost and schedule
Unbeatable786 2013年5月9日 12:17 - 393

workflow issue -Project server 2013
Balamurugan-S 2013年5月19日 7:14 - 1153

UpdateProjectProperty activity takes 5 minsto update a field
Hisham_Barrania 2013年5月12日 8:48 - 2132

RemoveDependencyRow method is not working properly
bhardia 2013年5月16日 5:37 - 060

Dreamspark Verification
Till G 2013年5月19日 11:32 - 186

error
123bava 2013年5月18日 11:40 - 184

Youtube with C#
Hmilkovi 2013年5月18日 11:56 - 2107

How to find a plan as Sub plan - PSI
ram kanumuri 2013年5月17日 15:36 - 2135

Hiding a button disables ribbon
MeerDev 2013年5月16日 4:08 - 198

Windows Phone 8
TV.Rahul 2013年5月17日 10:04 - 0104

[JSGrid] Error in jsgrid.debug.js
Quentin V 2013年5月17日 7:59 - 1127

Project Server 2010 - WssServers.FindByWSTS_SERVER_UID returns no rows using Site UID returned by ReadWSSSettings
Erik RHS 2013年5月16日 1:27 - 5925

Looking JS Grid Documentation - WebCast no available anymore
Javier Perez - MCPD, MCITP, MCAD, MCTS 2013年1月12日 16:23 - 1138

How to get all the assigned resources on a specific task programmatically?
M O N Z 2013年5月15日 7:43 - 1130

Set Resource Base Calendar and Resource Department fields programmatically
Meghask 2013年5月14日 13:55 - 0112

Populate field with Project name or Site name in list
ErikJungan 2013年5月16日 9:16