ASMX Based service in Project Server 2010

Answered ASMX Based service in Project Server 2010

  • 2010年1月27日 下午 06:32
     
     
    We have a PSI extension that was written for 2007 that we want to migrate to 2010.  The PSI is installed, GACed ect..   Pointing a browser to the URL (http://dcsrdsldev02/pwa/_vti_bin/psi/Microsoft.Dynamics.SL.MSP.CustomPSI.asmx?wsdl)  for the service yields the expected results and adding the reference in VS 2008  test app shows the two methods that are in the service.  So far so good.

    The problem is in calling the service.  I have a simple test app to call the Custom PSI but I get a soapexception "Unhandled Communication Fault occurred".  The innertext of the soap exception says " "There was no endpoint listening at http://dcsrdsldev02:32843/70c9c9b8d86d4610977b5b5727892eba/PSI/Service.svc that could accept the message. This is often caused by an incorrect address or SOAP action. See InnerException, if present, for more details." 


    I'm kind of stuck here.  Why is it trying to use a WCFservice?  Any guidance would be greatly appreciated.