load test results store->Is it required? RRS feed

  • Question

  • I'm using  vs2008 team edition for testers
        -load test containing multiple unit tests

    When I began this project I created a load test results store. Now I have created my own schema and push test results into the tables within that schema.

    This causes me to ask: Is the Load Test Results Store mandatory?

    I can't figure out how to "disconnect" this in the Administer Test Controller\Connection Properties dialog. The "Change..." button is greyed out.

    thanks