In Project Server 2010 is there a way to format the timesheet to get these options (like they had in 2007).
1). A solid black line that splits up the Administrative Time from the task assignments?
2). A way to shade the Planned Work cells when the user checks the Planned Work option in the ribbon?
3). Also, is there a way to default the option to have Planned Work selected for all users?
Thanks,
Chad