I have 2 Std. Ed. OCS servers installed in 2 locations. If A / V conferencing increases at one of the locations, can I off load one of the OCS servers by deploying a saparate A/V server at that location? Or do I need to upgrade to Enterprise Edition at that location?
You would need to deploy an Enterprise front-end pool and them transistion users over; the Standard Edition only supports a single consolidated front-end server.