locked
Synch same Table twice with Bi-Directional(UploadAndDownLoad) in two different scopes. RRS feed

  • Question

  • Hi,

    I need to synch the same table in two different scopes .The Sync Direction is UploadAndDownLoad(BiDirectional).

    During first Sync I need to force few values in few columns.During the Second Synch the table needs to be synched completely.

    Regards,

    Sachin K

     

    Thursday, July 28, 2011 12:11 PM

All replies