  • We have our jobs setup so that if an individual task fails within a job, the failed task is resubmitted as a new task within the same job.  The only issue is that if all resubmitted tasks finishes successfully within the job, then the job itself is successfull but the status on the Cluster Manager says Failed.  How can we control the job status and tell the Cluster Manager whether the job was successful or failed?