1) Create a lookup table. Populate the table with your team names.
2) Either use a new field or use the existing Teams field. Point the field
at your new lookup table.
3) Create a new Resource Center view or modify an existing view to include
the new field. Add a grouping option to facilitate navigation.
4) Open up your Resource Pool in MS Project and populate the new field for
each of your resources.
Andrew Lavinsky [MVP] Twitter: @alavinsky Blog: http://blogs.catapultsystems.com/epm