  • This is a follow-up on a previous post of mine. While the previous post is code-based my question now is more concept based.

    I want to override the calculations on salesorder and salesorderdetail.  I've written a plugin that makes the calculations and outputs them to "context.inputparameters["target"].  I debugged the entire process and it is working correctly.

    HOWEVER... while debugging the code in my plugin, running in pre-operation (stage 20) context, I see that there is a parentcontext with stage 30 (core system operations) which seem to overwrite my calculated values.

    Can I someway use the post-operation (stage 40) to do this while having no loops and have the user interface correctly or is there a different way to get this working?