locked
TFS 2010 single-server deployment system requirement RRS feed

  • Question

  • Hi, I've downloaded the Installing TFS 2010 Guide from the below link: http://www.microsoft.com/downloads/en/details.aspx?FamilyID=2d531219-2c39-4c69-88ef-f5ae6ac18c9f In the hardware recommendation section for more than 500 users only dual server topology is mentioned. For my situation the number of team project is currently 450 (with 1 dual core @2.00GHz Processor and 8GB memory)and it will grow to 2000 in a year or two. But i have only single server installation (no scope for dual serve). Is it possible to get good performance by increasing hardwares in that server (say 2 quad core processor at 2.33GHz and 16GB RAM)? -Thanks, Kuheli
    Wednesday, May 4, 2011 12:03 PM