Hi,
I'm trying a lot of scenarios about timesheets in PWA 2010. As my resources are overallocated now, I created a new project 3 weeks in the future. I published several times the project with its assignments. In Server Settings > Timesheets Settings and
default I checked "Allow future time reporting". But no assignment appears in the resource timesheet (excepted 1 out of 8).
What could be the cause of that?